Skip to content

Lodgeleven

Going Eco in North Wiltshire

  • Home
  • The Build
  • House Manual
  • Contact

Category: The Build

Feature wall

9th June 20189th July 2018 By dreamteamNo Comments
In the same copper grungy style as the kitchen splashback on the other side of the room ...  ...
Read More
The Build

Airtightness test done

31st May 20184th July 2018 By dreamteamNo Comments
We got 2.3 on the test which means it's eco-standard. Annoying after the chap left, we found a small leak and could probably be less than 2 now if measured again. ...
Read More
The Build

Stairway to Heaven Part Two

4th May 201818th October 2022 By dreamteamNo Comments
So that we're compliant with Building Regs, sadly we've had to balustrade up our lovely open plan staircase. Doesn't look too bad out of glass though. ...
Read More
The Build

Balustrade Up

9th August 20179th July 2018 By dreamteamNo Comments
Top level of house now building control compliant ...
Read More
The Build

Ready for dinner guests

3rd August 20177th July 2018 By dreamteamNo Comments
Kitchen in, first dinner guests coming soon  ...
Read More
The Build

Stairway to Heaven

5th June 20174th July 2018 By dreamteamNo Comments
No more ladders to get upstairs ...
Read More
The Build

Top Tiles

31st May 20174th July 2018 By dreamteamNo Comments
Talk about Just in Time, a magic tiler just appeared and all bathrooms done so plumber can get all three bathrooms online in time for 1st house guests mid-June. Hot water working too from Sun Amp heat batteries. ...
Read More
The Build

Let there be light

22nd May 2017 By dreamteamNo Comments
The LightWave wireless light switching system is now in and working ...
Read More
The Build

Getting Plastered

20th May 201720th May 2017 By dreamteamNo Comments
Been a while since last post as boy is this a big lodge with a lot of plasterboard. Anyhoo, getting there now and will be posting faster as very nearly plastered everywhere. Camping there next weekend so couple more blogs coming soon as floor goes down next week and stairs arriving Friday - we hope!    ...
Read More
The Build

We really have power

1st April 20174th July 2018 By dreamteamNo Comments
The meter arrived today so we can disconnect from our very kind next door neighbours   and the plasterboard is going up ...
Read More
The Build

Posts navigation

1 2 3 Next

Categories

  • Happenings (3)
  • House Manual (2)
  • The Build (30)

Posts

  • About Lodge 11 4th July 2018
  • Out and About 2nd July 2018
  • Longest Days 21st June 2018
  • Feature wall 9th June 2018
  • Airtightness test done 31st May 2018
  • Stairway to Heaven Part Two 4th May 2018
  • Sunrises good too here 9th November 2017
  • The Cat and Custard Pot 9th September 2017
  • Balustrade Up 9th August 2017
  • Ready for dinner guests 3rd August 2017
  • Stairway to Heaven 5th June 2017
  • Top Tiles 31st May 2017
contact Details

Tom Evans | 07974 407711 | thebookwright AT me DOT com

WordPress Theme | Square by HashThemes